Rooftop units and multi-zone systems
Service, repair and replacement of packaged rooftop equipment and multi-zone systems for offices, retail units and commercial spaces.
Offices, retail and commercial spaces, where cooling going down means the business stops. Multi-zone systems, rooftop units and maintenance contracts scheduled around your trading hours, not ours.
Licensed and insured Florida air conditioning contractor, licence CMC1251760. Serving Lee, Collier, Sarasota and Charlotte counties.
Service, repair and replacement of packaged rooftop equipment and multi-zone systems for offices, retail units and commercial spaces.
Usually two visits a year, scheduled in advance so they land when they suit your operation. Documented, which is what an equipment warranty asks for.
A property that cannot trade without cooling is an emergency by our definition. The work is planned around your hours where the job allows it.
Florida mechanical contractor licence CMC1251760, with the permits and inspections the jurisdiction requires handled as part of the job.
And if yours is not here, the assistant answers right away or we put you through to the team.
Contact usYes. A commercial property that cannot trade without cooling counts as an emergency. Call +1 (239) 851-5644 and describe the situation. We will not promise an arrival time on the phone, but we move a business that is losing trading hours up the list.
Normally two scheduled visits a year, planned in advance, covering the electrical side, refrigerant charge, airflow, drains, coils and controls, with a written record of what was found. The documentation matters: most manufacturers require it to honour a warranty claim.
Where the job allows it, yes. Planned work on a shop or an office is usually better done when the doors are closed, and that gets agreed when the visit is scheduled rather than assumed.
Yes. We service and repair equipment regardless of who installed it. For a maintenance contract we start with an assessment, so the first report tells you the real condition of what you have rather than what the last contractor said about it.
It is driven by how many units there are, their size, how accessible they are and how many visits a year the equipment needs. A single light commercial unit and a row of rooftop packages are different jobs. We look at the equipment first and quote the contract after, because a number given before seeing the roof is a number that changes later.
Call +1 (239) 851-5644 and describe it. A property that cannot trade moves up the list regardless of the day. We will not promise an arrival time over the phone, and a contract does not buy a guaranteed slot either: what it buys is that we already know your equipment and its history before we arrive.
Anchoring checked, drains clear, surge protection in place, and anything loose on the roof around the units dealt with before it becomes a projectile. After a storm the equipment gets inspected before anyone powers it back on, which is usually the difference between a service call and a replacement.
Yes. Multiple units or multiple sites get scheduled together so the visits do not arrive piecemeal, with one point of contact and one report instead of a different technician and a different story at every location.
Yes. Where the jurisdiction requires a permit and an inspection, the licensed contractor pulls it, and that is us. It is not paperwork you should be chasing, and work done without it is a problem that surfaces later, usually when the building changes hands or the insurer asks.